Overlap with a Permanent Supportive Housing Project
Why this happens: This warning appears when a client has
an active Permanent Supportive Housing (PSH) enrollment while another housing program,
such as Emergency Shelter, Transitional Housing, or Rapid Re-Housing, also
remains open. Since PSH indicates the client has moved into permanent housing, CMIS
flags overlapping temporary, crisis, or other housing enrollments that are
active during the same period.
Examples:
This can happen when:
o
A client moves into a PSH unit, but their
shelter enrollment is not closed after they leave.
o
A client exits PSH and enters transitional
housing or emergency shelter, but the PSH enrollment remains open.

How to fix this:
To resolve the overlap, verify the client’s housing timeline
and update the project entry enrollment.
- Review CMIS to identify the overlapping project
enrollments. This often occurs when a client moves from Emergency Shelter (ES)
or Transitional Housing (TH) into PSH.
- Confirm that the client’s Housing Move-in Date
is entered correctly to document the permanent housing placement.
- If the project start date or exit date is
incorrect, go to the client’s Entry/Exit tab, click the pencil icon next to the
entry or exit date, update it to the correct date, and click Save &
Continue. Use backdate mode when available; for shelter enrollments, backdate
manually, within entry/exit assessment, because this function is locked.
- If the overlap is between two permanent housing
projects, such as Rapid Re-Housing and PSH, confirm that the client is
receiving assistance from only one project at a time.
- If a previous provider left the enrollment open
or entered an incorrect project start date, contact the CMIS team at cmis@housingalliancede.org so they
can confirm the exact date the client left that provider’s project.